Diffusion-open, weldable roofing underlay membrane
Advantages
- Reliable seam sealing: homogeneously weldable
- Suitable for use under roof-integrated solar panels
- Excellent occupational safety: non-slip and abrasion-resistant surface
- Suitable as a roofing underlay to meet the most stringent requirements
- Maximum protection: diffusion-open, rainproof against driving rain, and highest hail-resistance HR 5 (Swiss VKF/AEAI directive) and as per EN 13583
- Easy to work with: robust with extremely high tear-resistance
- Also keeps structural elements dry during the construction phase: excellent protection against driving rain thanks to monolithic functional film
- Cutting and welding service available for SOLITEX WELDANO 3000
Areas of application
For use as a 3-ply diffusion-open, homogeneously weldable, rainproof/watertight roofing underlay membrane. Suitable for installation over pressure-resistant subsurfaces, e.g. timber sheathing, wood-based panels and wood-fibre underlay panels. Particularly suitable for use underneath roof-integrated solar panels.
Also available as a pre-fabricated sheet for your roofing project in Germany, Switzerland, Austria, France, the Netherlands and Belgium with the pro clima made-to-order cutting and welding service!
Installation instructions
Substrate
Suitable for installation on firm subsurfaces that provide sufficient pressure resistance when using a roller to press down on the welding bond, e.g. timber sheathing, wood-based panels and wood-fibre underlay panels. The subsurface must be dry, free of frost, clean and free of any sharp-edged or pointed objects. There must be no water-repellent substances (e.g. grease or silicone) on the membranes. Before welding is carried out, SOLITEX WELDANO 3000 should be wiped clean with a cloth. It is recommended that spot checks be performed to test the strength of the welded joints.
General conditions
SOLITEX WELDANO 3000 is to be installed horizontally (parallel to the eave). Unhindered drainage of water must be ensured. Cross joints are to be avoided. If membrane joints are necessary, they should be offset with respect to each other.
When used to protect building structures during the construction phase, SOLITEX WELDANO 3000 roofing underlay membranes can be subjected to outdoor exposure for up to 6 months in Central and Northern Europe and in Canada and the northern United States, and up to 4 months in Southern Europe, the rest of the United States and the rest of the world – e.g. as a temporary covering in accordance with the German ZVDH regulations. The roof pitch must be at least 3° (0.6:12). National regulations should be taken into account here.
Fasteners should not be applied on flat surface areas or in areas where water run-off is collected (e.g. in roof valleys). We recommend the use of corrosion-resistant fasteners.
The membrane edges are to be welded using the WELDANO TURGA system solvent welding agent or a hot air gun. The welding area must be dry and free of frost, dust and grease. If there is dirt (e.g. oil) on the surface, moisten a cloth lightly with WELDANO TURGA system solvent welding agent and use it to clean off this dirt. Both sides of the membrane can be welded and are suitable as upper layers. Welding with a solvent welding agent can be carried out at temperatures above 0 °C / 32 °F. Please observe the hazard notices on the container.
If a hot air gun is being used, we recommend a temperature of around 220 to 280 °C (430 to 530 °F) depending on the ambient temperature and wind conditions. Test this setting by carrying out a test weld on a sample piece of membrane. A 40 mm (1.6″) nozzle width has been found to be suitable in practice for welded joints between surface membranes. A 20 mm (¾″) nozzle may be more suitable in certain cases for more intricate joints.
Note: If membranes that have been subjected to 2 months of outdoor exposure are to be welded, the exposed membrane surface must be gently roughened using sandpaper (150 - 250 grade) to remove a film depth of around 2-3 μm (0.08-0.12 mil) so that a reactive surface is accessible again. This applies both for hot-air welding and for solvent welding using WELDANO TURGA.
The WELDANO ROFLEX MODI pipe grommets are suitable for pipe diameters from 30 mm to 360 mm (1³⁄₁₆″-14³⁄₁₆″) for roof pitches greater than 5° (1:12).
As an alternative to the use of the WELDANO ROFLEX, WELDANO INVEX or WELDANO INCAV system shaped elements, these elements can also be made by cutting appropriate shapes out of SOLITEX WELDANO 3000 membranes.
Important: The enclosed counter battens on the waterproof roofing underlay must be dry and chamfered on their upper side (≥ 3 mm; 120 mils) when they are installed. Ideally, structural timber should be used.
Additional technical information for Germany:
Depending on the requirements demanded of the roofing underlay when used as an additional measure, the roofing underlay can be installed to be rainproof or watertight (in accordance with ZVDH). Rainproof roofing underlay: The counter battens are installed over the roofing underlay membrane. Waterproof roofing underlay: The counter battens are integrated into the sealing layer. The roofing underlay membrane is installed over the counter battens here or else SOLITEX WELDANO-S 3000 sealing strips are fitted over the counter battens and welded to the roofing underlay membrane on both sides.
Ridge ventilation is permitted in the case of a rainproof roofing underlay. The roofing underlay membrane should then stop 30 mm (1.2″) before the apex of the ridge. Cover the ventilation opening with a membrane strip over the counter batten along the ridge axis. Ridge ventilation is not permitted in the case of a waterproof roofing underlay.
The SOLITEX WELDANO 3000 roofing underlay membrane is to be sealed in a windproof and waterproof manner at the eave flashing. The eave flashing can be installed as a drip board under the gutter or as a guide board that guides water into the gutters.
To protect the roofing underlay membrane from direct sunlight on a permanent basis, the width of the guide board should be selected appropriately depending on the roof pitch and orientation of the building structure or else it should be installed with an eave membrane to provide UV protection, e.g. SOLTEMPA.
Made-to-order membranes for roof projects: Cutting and bonding service for underlay and airtightness membranes
Make your roofs weathertight and airtight even more quickly and easily
Are you planning to use pro clima membranes on an upcoming roof project? If so, you no longer need to worry about bonding the individual lengths of membrane to each other and cutting them to size to fit your roof surface. You can now order many pro clima membranes already cut and bonded to match your roof surface! As part of this service, SOLITEX WELDANO 3000 roofing underlay membranes are welded together in the workshop, and SOLITEX MENTO 3000/5000 connect, SOLITEX QUANTHO 3000 connect, INTELLO X connect, DA connect and DASAPLANO 0,01 connect are joined using their self-adhesive strips.
In this way, pro clima takes care of the preparation of underlay and airtightness membranes for your roof project in an automated, tailored and precise manner at a reasonable price. You will be able to install reliably sealed roof structures more efficiently, even if your roof geometry demands more complicated shapes. This made-to-order pre-fabrication service saves valuable installation time on site and also makes you less dependent on weather conditions.
This service is currently available in Germany, Switzerland, Austria, France, the Netherlands and Belgium.
Advantages
- Time savings due to shorter installation period on site
- No additional finishing work required: made-to-order membranes are delivered that fit your roof surface perfectly
- The underlying building structures remain dry: prepared sheeting provides immediate protection in adverse weather conditions
- High-quality end products thanks to assembly under protected conditions in the workshop
- Efficient installation thanks to technical support from pro clima
How does this service work: It's this easy ....
1. Tell us the shape and dimensions of your roof surface
a. Define the roof type
What type of roof is involved? Is it a gable roof, a single-pitched roof, a tented roof, etc. Please specify the geometrical form of the roof and provide an outline sketch of the roof with actual lengths and surface areas.
b. Specify any special geometries
Please specify any special geometries such as valleys, roof dormers, skylights etc. The absence or presence of such features will determine whether the resulting pre-fabricated sheet will be a standard geometry (2D and rectangular) or a special geometry (2D non-rectangular, 2D rectangular with additional sections).
c. Specify the eave and bargeboard lengths
Please specify in your drawing the dimensions of the bargeboards and eaves and all dimensions – e.g. valley lengths – to be taken into account in determining the surface area.
d. Specify the ridge position and water run-off direction
Please indicate on your drawing the position of the ridge with a line and the water run-off direction with a direction arrow.
e. Specify the starting position and roll-out direction (longitudinal and perpendicular)
The prepared sheet is generally delivered to your building site as a package that is rolled up in two directions.
Have you planned a specific roll-out starting position, direction and sequence? If so, please mark this position with a cross. Ideally, you should indicate the sequence of roll-out directions with arrows and sequential numbering (1, 2).
f. Additional services
- Marking/cutting of skylights
- Marking/cutting of any additional penetrations (vent pipes etc.)
- Marking of counter battens
In order to be able to provide these services, we need you to send us .dwg or .dxf files and complete our order and inquiry form, which is available here
2. Production of the pre-fabricated sheet and shipping
Once you have placed an order, the individual lengths of membrane will be stuck or welded together, as appropriate, and cut to size for your specific roof project. If required, the positions of the counter battens, skylights and any other penetrations can be marked.
The prepared sheet is then rolled up, placed on a pallet and shrink-wrapped for shipping. We aim to deliver to your site within 10 days of the order being placed for delivery locations in Germany, Austria, France, the Netherlands and Belgium.
3. Roll out and install the sheet
At the building site, the rolled-up package is lifted to the planned starting point on the roof and is then rolled out as planned.
Our Technical Support will be glad to provide assistance.
pro clima on the outside ... and it's a wrap!
Weathertightness with pro clima
Find out more about pro clima's system solutions and products for sealing your building envelope on the outside - with roofing underlay membranes, breather membranes for facades, protective membranes for timber structures during the construction phase, and a full range of sealing tapes, sealants and accessories.